Mandrel Test

Mandrel Test

Mandrel testing is mandatory for all new developments under the Fibre ready guidelines (G645:2011).

Useful Articles – News

Prior to any handover of ownership of Conduit every Conduit larger than P20 must be proved by passing a mandrel of a diameter no less than 80% of the conduit internal diameter
through its entire length

Our ServicesPolicies and Standards for Mandrel Tests are:

  1. Test every Conduit larger than P20 with mandrel of a diameter no less than 80% of the Conduit internal diameter through its entire length.
  2. Test every P20 Conduit with mandrel of a diameter no less than 80% of the Conduit internal diameter through its entire length if it is required by client.
  3. Correction of conduits when a mandrel test does not pass easily.
  4. Use of draw wire suitable for use as a hauling aid.
  5. Provide a report accepted by any service provider.
test mandrel

Do you need to perform a Mandrel Test?

Contact us today – our technicians are ready to help you solve that problem.